Effluent Treatment Plant (ETP) with Treated water injection unit for Oil & Natural Gas Corporation (ONGC), Karaikal
The project scope consists of Design, Engineering, Procurement & Construction (EPC) of Effluent Treatment Plant (ETP) on Turnkey basis.
The produced water from group gathering station (GGS) are treated in the ETP having a capacity of 1300 m3/day. The treated water is further reinjected into the Oil wells.
The treatment unit processes comprise of Clariflocculator, DMFs, Conditioning chemical dosing system, Reinjection pumps & Sludge drying bed.