The project scope consists of Design, Engineering, Procurement & Installation (EPC) of Hazardous liquid Waste Incineration plant.
The plant is designed for incineration of 1250 kg/hr of pharmaceutical & bulk drug intermediate liquid waste.
The treatment steps consist of Incinerator, Panel type waste heat recovery boiler, Variable throat venturi type wet scrubber & Caustic based scrubber for acidic flue gas.