Paramount Limited
 
 

Home > Projects > H2S stripper PDO, Oman
 
H2S stripper for Thayfut WTP project for PDO, Oman

 

The project scope consists of Design, Engineering, Procurement, Supply and commissioning of H2S Stripper plant.

The H2S Plant has a designed capacity to treat 33.3 m3/hr of Raw Water. The effluent consists of 8.4 mg/l of H2S contaminant. The treated water stripped of H2S to a level of 1.23 ppmv is disposed off.

The treatment unit processes comprise of packed bed air stripper in the first stage followed by a second stage caustic soda cum sodium hypochlorite bleach packed bed scrubber, exhaust fan, vent and chemical storage and pumping skid.

 
Our Offices Downloads Site Map Contact Us
www.paramountlimited.com © 2015